Requires examiner to carry out an inspection to a defined standard under working conditions in Tube inspection that contains Eddy Current Testing (ECT), Remote Filed Testing (RFT) and Internal Rotating Inspection System (IRIS). Examiner must demonstrate their knowledge, experienced and skill to reliably detect and sizing relevant discontinuities in a specific application.
Test time
8.00 - 9.00 : Equipment preparation
9.00 - 12.00 : Practical Examination
13.15 - 13.30 : Objective Test (multiple choice)
13.30 onwards : Interview
Interview takes approximately 30 minutes.
*No extra time if it is later than the specified time.
Test specimen
Examination participant will take 2 test specimens contain of one SS304 and one SA179.
The exam will be conducted as follows.
1. ECT and IRIS for SS304 material.
2. RFT and IRIS for SA179 material.
Examination preparation
1. Prepare the equipment like in real practice. (The examination venue has electricity and water supply).
2. Participant must prepare their own instruments, calibration tubes and other relevant equipment.
3. Do not use phone during the exam.
Acceptance criteria
Team leader
1. Equipment preparation can be correctly and properly prepared within the specified time.
2. Setting up the program is completely correct.
3. Calibration can be performed correctly and properly according to the procedure.
4. Interpretation
- Detection : 100% (Defect must be detected in all locations).
- False call : 0 (Defects beyond what it actually exist must not be detected).
- Flaw characterization : 100% (Able to identify the signal characteristics).
5. Defect location
- Able to identify where defects were found.
Interpreter
1. Equipment preparation can be correctly and properly prepared within the specified time.
2. Setting up the program is completely correct.
3. Calibration can be performed correctly and properly according to the procedure.
4. Interpretation
- Detection : 100% (Defect must be detected in all locations).
- False call : 0 (Defects beyond what it actually exist must not be detected).
- Flaw characterization : 100% (Able to identify the signal characteristics).
5. Defect location
- Able to identify where defects were found (tolerance +- 300 mm).
6. Able to specify % wall loss or remaining wall thickness correctly (tolerance +- 10%).
7. Able to explain the principles of each technique.
Report :
1. Prepare a report with separate techniques, a total of 4 papers.
File Naming :
1. File setup : DD-MM-YY_Name Surname_setup_technique
2. File Data : Tube-no.X_Technique
*** Save the file in Folder : Name_Surname_Company
A person who violates the rules of the GCME exam reserves the right to review the results and will be excluded from taking any examinations organized by GCME.
1. เงื่อนไขการเข้ารับการสอบแก้ไข
1.1 สามารถเข้ารับการสอบแก้ไขเฉพาะ Part ที่ตก ได้ 1 ครั้ง หากไม่ผ่านต้องเข้ารับการสอบใหม่ทั้งหมด
1.2. สามารถเข้ารับการสอบแก้ไขโดยเว้นระยะจากการสอบครั้งแรกอย่างน้อย 45 วัน หรือเว้นแต่แสดงหลักฐานที่ทางบริษัทผู้รับเหมาอบรมเพิ่มเติมให้พนักงานมายื่นประกอบการขอรับการสอบแก้ไข
2. เงื่อนไขการต่อใบอนุญาต (ใบอนุญาตมีอายุ 2 ปี)
2.1. การต่อใบอนุญาตโดยไม่ต้องรับการทดสอบใหม่ (UTM/PT/MT)
นำใบอนุญาตต่ออายุที่ GCME ได้อีก 6 เดือน โดยไม่ต้องเข้ารับการสอบใหม่ หากมีการปฏิบัติงานภายใน 3 เดือน ก่อนใบอนุญาตสิ้นอายุโดยให้แนบหลักฐาน Inspection Report เพื่อประกอบการขอต่อใบอนุญาต
2.2. การต่อใบอนุญาตโดยต้องรับการทดสอบใหม่
2.2.1. UTM / PT / MT
- ใบอนุญาตสิ้นอายุไม่เกิน 6 เดือน: เข้ารับการสอบสัมภาษณ์
- ใบอนุญาตสิ้นอายุเกิน 6 เดือน แต่ไม่เกิน 1 ปี: เข้ารับการสอบสัมภาษณ์ และ สอบปฏิบัติ
- ใบอนุญาตสิ้นอายุเกิน 1 ปี: เข้ารับการทดสอบใหม่ทั้งหมด
2.2.2. TUBE Inspection / PAUT
เข้ารับการทดสอบใหม่ทั้งหมดทุก 2 ปี
Specimen detail
Test specimen
Potential flaw mechanism's
The following table identifies the guideline, potential flaw mechanism's that may be included in each test specimen. The number of flaws in each test specimen may vary for each test set. Test specimens may be unflawed along the entire length.